INSTALLATION STEP 4
• Place the centering insert (1) and fi x it with the screw (2).
• Place the control handle (3) and fi x the grub screws (4).
• Screw the lever (5).
• Place the O-ring (6) and the spout (7).
• Fix the spout with the grub screw (8).
INSTALLATION STEP 4
• Place the centering insert (1) and fix it with the screw (2).
• Place the control handle (3) and fix the grub screws (4).
• Screw the lever (5).
• Place the O-ring (6) and the spout (7).
• Fix the spout with the grub screw (8).
INSTALLATION STEP 1
• Before installation drill three holes, mmØ27 / inØ1,06 for the spout
and mmØ32 / inØ1,25 for the two lateral stop valves.
• Screw the nuts (1) on the threaded rod and the lateral stop valves
(2).
• Place the metal rings (3).
• The lateral stop valve with color BLUE is on the right and RED on the
left.